Kingstone retaining wall repair company in Colorado
Limestone retaining wall repair tips: If you’re building tiered retaining walls, set each tier back far enough to prevent the weight and pressure of the wall above from destroying the one below it. The rule of thumb is to separate wall tiers by a distance that’s no less than twice the height of the wall below. So if the bottom wall is 4 feet tall, the wall above it should be built at least 8 feet behind it. Walls more than 4 feet tall will likely require a building permit and a plan made by a licensed engineer. The engineer will specify the base’s width and depth, how far down the base course should be buried, and whether or not a geogrid (soil reinforcement system) should be used.
Ensure you order everything you need at once and set aside an allowance for breakages and cutting. Contrary to popular belief, building a fence on top or behind a Block Retaining wall is rather easy. In some cases where only a small amount of retaining is required as in 200-400mm, the fence can be built directly on top of the wall with the fence posts passing through the walling blocks and concreted into the ground as normal. This method would be ok to use with all forms of fencing such as post and rail, colour bond post and rail, good neighbour fencing, tubular panel and even pool fencing.
We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. Discover more info at Building and repair of retaining walls Colorado.
Good drainage is essential for any retaining wall. Drainage is provided by filling coarse gravel behind the wall and by building weep holes into the wall. Make weep holes by inserting short lengths of 2-inch plastic pipe or 3-inch drain tile in the forms when they are built. The first row should be 2 inches to 4 inches above ground level. If the wall is higher than 4 feet, place a second row of weep holes 3 inches above the first.
After your drainpipe is in place, you should backfill the rest of the space behind the blocks with either sand or pea gravel—either will allow water to filter through to the drainpipe at the base of the wall. For the best results, backfill with a few inches of the material after laying each course of blocks, and use a hand tamper to compact the material. By tamping the backfill every six inches or so, you’ll ensure that it is packed tightly, which will provide additional support from the pressure of the soil behind the wall.