Pharmaceutical cleanroom factory right now
Clean room standard provider right now? This specification is designed to implement relevant national guidelines and policies, creating standard construction acceptance requirements, unify testing methods, and ensure project high quality, save extra energy, protect the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements. Find additional information at clean room class.
The clean room must be created according to the design drawings. If the design needs to be modified during construction, there shall be a change notice from the design unit. Construction and acceptance cannot be carried out without drawings and technical requirements. Before the construction of the clean room, a detailed construction scheme and procedures shall be formulated. During the construction, all types of work shall cooperate closely and construct according to the procedures. The type of work constructed first shall not hinder the subsequent construction.
Mainly control the pollution of air dust particles and organisms (bacteria) to working objects, and maintain a negative pressure with the atmosphere inside. Pharma cleanroom project It is suitable for precision machinery industry, electronics industry, aerospace industry, high-purity chemical industry, atomic energy industry, optomagnetic product industry, LCD, computer hard disk; pharmaceutical industry, hospital, operating room, sterile ward, food, cosmetics, beverage products Animal laboratory, physical and chemical laboratory, blood station, etc. More cases check our cleanroom project page.
The main materials, equipment, finished products and semi-finished products used in the project shall comply with the design regulations, and shall be provided with factory certificate or quality appraisal certificate. When there is doubt about the quality, it must be inspected. Expired materials shall not be used.
Today (Suzhou Pharma Machinery Co., Ltd.) will introduce to you, clean room airflow and influencing factors. There are many factors affecting the airflow in the clean room, such as process equipment, personnel, clean room assembly materials, lighting fixtures, etc. At the same time, the distribution point of airflow above the production equipment should also be considered.
During the construction of the clean room, the intermediate inspection and acceptance shall be carried out after the construction of each process, and the records shall be put on record. In addition to this specification, the construction and acceptance of the clean room shall also comply with the provisions of the current relevant national standards.The architectural decoration construction of the clean room shall be carried out after the completion of the roof waterproof works and the external enclosure structure, the installation of the external doors and windows, and the acceptance of the main structure.
For the unidirectional flow (laminar flow) clean room, the air supply volume is determined by the product of the average wind speed of the room section and the cross-sectional area, in which the measured section of the vertical unidirectional flow (laminar flow) clean room is the horizontal section 0.8m away from the ground; The horizontal unidirectional flow (laminar flow) clean room takes a vertical section 0.5m away from the air supply surface. The spacing of measuring points on the section shall not be greater than 2m, and the number of measuring points shall not be less than 10, which shall be evenly arranged. Hot bulb anemometer for instrument.
Its contents include the indoor decoration works, the installation of doors and windows, the gap sealing, as well as the sealing of the joints between various pipelines, lighting lamps, purification Suzhou Pharma is one of the leading turnkey project providers for pharmaceutical, food, herbal, cosmetic, electronics factory and chemical plants. We offer projects as per GMP regulations. As being pioneers in this field, the solutions from Suzhou Pharma is readily accepted by the customers.
The clean room is generally made of foam color steel or rock wool board with a vertical wall and an independent air-conditioning air supply system. The air is filtered through high-efficiency three-stage filtration in junior high schools. The personnel and materials are equipped with an air shower room and a transfer window for clean filtration.
What is the purpose of the clean room test of the clean workshop? Most of the owners are based on the original vision of the purification project to complete the test indicators. Of course, this is the most straightforward goal and method. After all, our intention to build a clean room is also As such, there is a need to achieve our air cleanliness. In a single-flow type clean room, the location of the wind speed measurement can be specified by the owner, usually on the surface of the filter screen or at the working height. However, it should be noted that it is the air velocity measurement of the filter screen (the surface of the filter screen) or the indoor air velocity measurement of the clean room (working height). Clean workshop, clean room, clean room — the purpose of clean workshop and clean room test. Read additional information on https://www.sz-pharma.com/.